Official completion of cellar
Even though it is not really completed, it can be measured, and today was the official turnover of the cellar. Streif needs to confirm all of the measurements before it tries to install a house on top of it. Knecht, the cellar firm, needs to patch up the overlapping areas with waterproofing stuff.
I have one shot of the cellar guy doing some measuring inside. The bit of water in there is due to rain coming in at the holes at the top, not leakage.
I have one shot of the cellar guy doing some measuring inside. The bit of water in there is due to rain coming in at the holes at the top, not leakage.
